1. Right on the spot check all components and their functions.
2. Check the ground, whether the scaffolding tube on which the installation and moving, can support the weight of the scaffold.
3. When installing a scaffold, recommended a temporary protective barrier.
4. The scaffold platform design of uniform distribution of the biggest bearing load of 250 kg, and the biggest focus on all platforms static load of 248 kg per square meter. Base, each stretch the leg of the biggest bearing load of 750 kg, and each leg of the indentation maximum bearing load for l400 kilograms.
5. During the assembly and use, must always use provided by the built in ladder, or a type to climb the ladder outside.
6. Do not use any objects on the platform to achieve a higher level.
2 lift facilities
Scaffolding parts must be with manufacturers to provide a special lifting frame items PE rope hoisting and reliable quality, to ensure the security firm.
1. Must be clear and the wind, strong winds and high winds. Suggested that under the condition of the wind speed is greater than 7.7 m/s to stop using scaffolding homework; If it is a strong wind, wind speed 11.3 m/s, the scaffold must be tighten on rigid structures; If the wind speed increase to 18 m/s, to dismantle scaffold.
2. You cannot change the equipment. The damaged parts must never use.
3. Assembly frame assembly tools or materials, must be conducted in the interior of the scaffolding foundation, ensure the safety of the supporting platform supported work load, and shall not exceed the scaffolding tube structure.
4. Assembly of the scaffold is a work platform, is used to enter other buildings.
5. Be sure to clear horizontal force (such as power tools) produce instability, maximum horizontal force for l96N.