Do You Know the Production Process for the Scaffolding Tube
Scaffolding tube maintenance skills
1. Observe the scaffold whole or partial vertical deviation, especially in observation scaffolding corners, breaking in two side port, whether the deflection, sinking. If found a strange person, shall immediately organize personnel for reinforcement.
2. Shop regularly check mat bamboo basketry, timely repair hamstring breaks, fill the hole. And at the same time check the colligation point of bamboo basketry.
3. Even the wall fastening and displacement of reinforced bar. Affecting the construction of the site, measures should be formulated in the technology sector, may shift change effort, the operator shall not, without even the wall displacement of bar.
4. Check carefully whether the federated eye network root bundle loosening, whether the net twine breakage, found loose timely recovery, finding a breaking change in time.
5. Remove accumulated in scaffold materials, brick, concrete block dangerous parts of the clutter.
6. Supervise pile by using personnel material, make it no more than the construction load. Scaffold for masonry, pile of bricks, for example: three scaffolding tube layer below the line standard brick, porous brick four layer below the line
Scaffolding tube production process
Need to pass a series of process, from raw material to the finished product kinds of mechanical equipment are needed to complete the process and welding, electric control, test device, the equipment and devices in accordance with the requirements for different technological process has a variety of reasonable arrangement, tube shelf typical process:
Scaffolding steel pipe
Open roll - strip leveling - end shear - strip butt - looping store material, forming, welding, debarring, sizing, flaw detection, fly - test - tube straightening - cutting section processing, water pressure test, flaw detection, printing and coating - finished products.