Difference Between Floor Type Double Row Scaffold and Lifting Ringlock Scaffolding:

Time:2016/07/27

1, a one-time investment materials greatly reduced, which can improve the utilization rate of turnover materials;
2, the operation is simple, fast, less labor input, low labor intensity;
3, do not take up the tower crane, use process to speed up the construction schedule;
4, reduce the engineering cost. Specific contrast is as follows.

 

scaffolding planks

 

Material: floor type double row steel pipe scaffold for disk use steel tube, card consumption and large building materials such as; And climb the consumption of only 10% of the composite frame.
Artificial aspects: floor type double row steel pipe scaffold structures, disks, dismantled dangerous operating environment, not only the intensity of labor is big, and human consumption; Up and down operating environment is good, when climbing scaffold workers labor intensity is small, artificial consumption about 50% lower than the integrated frame.
Safety: floor type double row steel pipe scaffold plank structures, disks, dismantling process is prone to accidents, poor safety; And climb with fall prevention, prevent tilting device, such as synchronous fault monitoring multiple protection, safe and reliable.

 


Civilization engineering: floor type double row steel pipe ringlock scaffolding the whole project process, constantly brought out a lot of material, carry on delivery, clutter under difficult to clean up, take up the engineering site, safety net maintenance quantity is relatively large; While climbing frame do not take up engineering site, the whole project facade relaxed and clean.

 

scaffolding planks

 


Progress: floor type double row tube ringlock scaffolding planks are only in the case of building material supply on time, can meet the engineering requirements; While climbing frame lifting speed, about two days can rise or fall, and does not take up the tower crane, the overall progress of helps speed up the time limit for a project.
 