Construction Steps and Precautions for the Attached Scaffolding Planks
Scaffolding planks attached lifting scaffolding, steel construction steps and matters needing attention attached lifting scaffolding steel Scaffolding planks) (referred to as the "overall ascension (steel Scaffolding planks) scaffold" the body of the rack is designed according to the three stories high with fasteners (steel scaffolding planks) type steel pipe scaffold set-up, bar at the bottom of the truss structure, mining play end bearing tripod, bearing a tripod is used through walls bolts on has finished casting of reinforced concrete wall. Setting up elevator tripod, furnish hoist.
In addition, the spring is set on the wall on each floor of a set of used to guide wheel, in order to prevent the frame body during the process of lifting too much shaking. Frame body before ascension, down load carrying a tripod of the bolt and the wall cross section 2 temporary retaining bolt. Start the hoisting machine, make whole outside the frame body along the guide after a storey high, again through the upper bolt and temporary retaining bolt bearing a tripod, construction work can be achieved. So, can meet the needs of the construction.
Attached type elevator (steel planks of Ringlock scaffolding) is mainly composed of frame body system, attached to the wall system, climbing system of three parts. Which frame system from the vertical main frame, horizontal bearing truss, steel fasteners (steel scaffolding platform planks) framework, etc;
Attached to the wall system by the embedded bolt, even the wall device, guide, etc; Climb system consists of electric control system, power equipment, bearing device attached to the wall, frame body bearing device, etc; Climb power equipment can use electric hoist, electric screw or hydraulic jack.