ADTO News
A Right Way to Manage the Scaffolding Tubes Make the Project Move Faster
Scaffolding tubes daily management way. Begins with the use of safety management, the management of scaffolding. Whether movable scaffolding or bowl scaffold, or steel pipe fixed scaffolding, there are certain management practices, and should often go to manage them, although the scaffold itself has no electrical or mechanical components, relative is relatively stable, but because the scaffolding is still have a certain height, so still want to elaborate management, to ensure that the scaffold is absolutely safe.
Scaffolding daily management generally includes: 1 into the place it is important to pay special attention to the high tension line, in the general can avoid to avoid as far as possible, just hide not open use insulation board in isolation.
2, after the completion of the scaffold erection shall be made of personnel management, statistical number every day.3 scaffolding acceptance regulation once every three steps acceptance, signed by the company quality agreed to rear can use.4 scaffolding rods, fasteners and rigid Rachel prohibit random demolition of 5 forbidden on scaffolding cable wind rope, and set up lifting the bar, not allowed to adopt the way of suspension tilt hanging from the feed on the scaffold.
First frame tube is indeed a very commonly used props, but did not use all of the time, so if buy, also more waste, do not often use, can only be picked up, put in the side, a lot of space.
Therefore scaffolding rental service, then do not have this problem, because you can directly to return these scaffolding to leasing companies, only need to pay part of the rental fee is ok. And should not possess some space, also won't waste too much money waiting for their own property loss. There is wood springboard rental service.