Aluminum Formwork System Project: High-rise residential for CSCEC - ADTO Group
Time:2019/10/31
Four repeated high-rise buildings adopts aluminum formwork system, The construction is very fast with this light weight system,around 4 days can finish one typical floor with skilled workers. The average cost is lower than traditional systems.