WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update

Aluminum Formwork System Project: High-rise residential for CSCEC - ADTO Group

Time:2019/10/31

Four repeated high-rise buildings adopts aluminum formwork system, The construction is very fast with this light weight system,around 4 days can finish one typical floor with skilled workers. The average cost is lower than traditional systems.

Related Projects