1, steel fasteners, scaffolding, should be paid attention to in the foundation level solid, and set up base plate, and have reliable drainage measures to prevent the water soak a foundation.

 

 

 

 

scaffolding

 

 

 

2, according to the situation of rod set up the wall and load size, the commonly used open type double row scaffolding rod. Horizontal spacing generally 1.05 ~ 1.55 m, building scaffolding interval is 1.20 ~ 1.35 m, commonly decoration or building, decoration and scaffolding generally is 1.80 m, poling longitudinal from 1.2 ~ 2.0 m, which allows the erection 34 ~ 50 m in height. When for single row, poling cross from 1.2 ~ 1.4 m, poling longitudinal from 1.5 ~ 2.0 m, allow the erection of 24 m in height.


3, longitudinal bar should be set in the inside of the stud, should not be less than 3 across its length, longitudinal rod can use docking fastener, lap may be adopted. If fastener docking methods, docking fasteners should be staggered arrangement; If connected by lap, lap length should not be less than 1 m, and shall be equally spaced set three rotating fastener stationary.


4, scaffolding the master node (that is, the stud, longitudinal rod, lateral horizontal bar three pole near the buckle contact) must be set at a horizontal level pole with a right-angle fastener hooking and it is forbidden to dismantle. The master node center distance of the two right-angle fastener should not be greater than 150 mm.

 

 

 

 

scaffolding

 

 

 

In double row scaffolding, lateral horizontal overhanging length should not be greater than at the end of the stem against the wall poling horizontal distance of 0.4 times, and should not be greater than 500 mm.