WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

The Cuplock Scaffolding Factories Aiming At Real Development

Time:2016/10/09

In demolition of cuplock scaffold shelf, to divide the relevant section of the first, around the perimeter of the area, and set up on the fence or erect warning marks, on the work site, to set up the unit will command, in addition, to prohibit the construction personnel entering scaffolding working areas. For the user details cuplock scaffold disassembly process in detail, when removing the need to pay attention to, avoid accidents.

 

 

 

scaffolding

 


Personnel engaged in the operation of the demolition construction must wear a good helmet and fasten your seat belt, soft wear non-slip shoes. When demolition of poling, want to held the post first, then open the last two buckles, in the open brace, cross bar, bridging, should be in the middle of the buckle, and will hold in the middle of, and then will end buckle down.

 


For even the wall point location, should follow the progress of the demolition, step by step in dismantling tossing the scaffolding brace, should be set on the temporary support.
Before dismantling large shelf, to set aside the ramps, channels to reinforce, feeding platform, etc, to ensure the integrity of is dismantled. Near the demolition process, such as electric circuit, should take corresponding isolation measures, to prohibit frame pole come into contact with the wires.

 

 

scaffolding

 

 


For all kinds of material have been removed, you should use the rope tied, and then by using the pulley forbid throwing down on, for the material have been removed to bring, increases with the increasing demolition of classified storage. In the demolition of an outer layer of chimney, water tower, don't will frame material met cable wind rope, when open to the cable wind rope position, can solve cable wind rope.
 

Related News