WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

How to Build the Scaffolding to Make it Moe Stable and Stronger

Time:2017/03/01

A, before installing the scaffolding hanging institutions need to do some preparatory work. Scaffolding leasing director suggested according to the shipping list box, counting the number of scaffolding parts components, check for damage to other retail parts, such as deformation anomalies. If there is any fault can be directly related to scaffolding leasing director for timely maintenance, to ensure that the scaffold of the initial mass.

 

 

 

scaffolding

 

 


Correct installation, scaffolding hanging agencies. Scaffold quality head to remind in the process of installation, must need professional and technical personnel to install, and ensure no mistake in the process of the entire installation operation.

Will be inserted rod inserted into the front of the triangle sleeve inside, according to the height of the wall, the height of the inserted link within the scope of 1.15 to 1.75 meters, bolted, finish before installation; Stent, insert the plug stem stents inserted before the height of the dry and poor as tall as a lever, bolted, complete back seat installation.

B, Will beam, back rest before loading respectively before and after stent insertion rod inside the casing, the former with centre sill beam, back rest together, the distance between before and after stent should be put to maximum, placed on the pillar in front seat insert rod bushing. Small connected set of in stent inserted rod bushing, bolted, bracket assembled. Will work, safety rope, wire rope according to the above methods respectively fixed on the beam before wire rope hanging board, and the safety cap on a piece of wire properly.

 

 

 

 

scaffolding

 

 


Three, scaffolding hanging mechanism debugging after the installation is complete. Scaffolding remind debugging after the installation is complete, head of China is very important, suspension institutions must meet resistance to capsizing, part length usually is 1.1 meters to 1.3 meters.

Related News