The erection steps of ADTO Aluminum Formwork System can be listed as below.

 

 

Step 1:

Erection of Inner Corner and adjacent Standard Wall Panels with Rockers.

 

Step 2:

Continuing Standard Wall Panels with Wall Tie.

 

Step 3:

Adding Wall Panels End Cover above Standard Wall Panel.

 

Step 4:

Erecting Inner Corner and Wall Panel.

 

Step 5:

Erecting the Beam Panel with the help of Deck Beam and Prop.

 

Step 6:

Erecting Floor Outer Corner and Floor inner corner on External Wall.

 

Step 7:

Concreting after proper level and alignment.

 

Step 8:

Move for the next level.

 

 ADTO Aluminum Formwork System

 

 

The Advantages of this Erection Method are as Follows:

 

 

(1) Rooms can be closed and squared by assembling only one side of the wall panel. If misaligned, it is easier to shift rows of single panels

 

(2) If steel reinforcement is likely to interfere with the placement of the ties, it can be seen and corrected without delaying the panel erection

 

(3) Enables fast start-up of deck teams as the first rooms can be closed quickly

 

(4) Continuous steel reinforcement for the walls creates a barrier between the two sides of the formwork, so the work proceeds at the pace of a single erector.